Understanding Spanish EV Charging Regulations

Installing EV charging infrastructure in residential buildings requires compliance with multiple regulatory frameworks. Spanish electrical codes, local building ordinances, and community property law all play a role.

Key Regulatory Frameworks

Multiple layers of regulation govern EV charging infrastructure in Spanish residential buildings.

ITC-BT-52: Electrical Infrastructure Requirements

The Spanish Low Voltage Electrotechnical Regulation establishes technical requirements for EV charging installations. ITC-BT-52 specifically addresses infrastructure for electric vehicle recharging in buildings. This regulation covers electrical capacity requirements, protection systems, cable specifications, and safety measures.

Compliance with ITC-BT-52 is mandatory for all EV charging installations in Spain. Our technical assessments and installation work follow these requirements to ensure your infrastructure meets legal standards.

Community Property Law

Installing charging infrastructure in community buildings requires approval from the property owners' association. Spanish horizontal property law establishes voting thresholds and procedures for common area modifications. The required approval percentage varies depending on the scope of work and impact on common elements.

We prepare documentation that addresses legal requirements for community approval. Our proposals clearly explain how the installation affects common property and individual rights.

Municipal Building Codes

Local municipalities may have additional requirements for electrical installations and building modifications. Permit requirements vary by location. Some municipalities require specific documentation or inspections beyond national standards.

We research local requirements for your specific location and ensure all necessary permits are obtained before installation begins.

Distribution Company Requirements

When electrical capacity upgrades are necessary, your local distribution company has specific procedures and technical requirements. Applications for increased power supply require detailed technical documentation. Processing times and approval criteria vary by company and region.

Our experience working with distribution companies across Spain helps navigate these procedures efficiently. We prepare applications that meet company requirements and follow up to keep the process moving.

Required Documentation

Proper documentation ensures regulatory compliance and smooth project approval.

Technical Project Report

Detailed electrical engineering documentation describing the proposed installation. Includes capacity calculations, equipment specifications, safety systems, and compliance with ITC-BT-52. Required for community approval and permit applications.

Electrical Installation Certificate

Official certification issued after installation completion. Documents that the work was performed according to approved plans and meets all safety requirements. Required for legal operation of charging infrastructure.

Community Meeting Minutes

Official record of property owners' association approval. Documents the vote, approval percentage, and any conditions attached to the authorization. Required for proceeding with installation work.

Municipal Permits

Local government authorization for electrical work and building modifications. Requirements vary by municipality. May include building permits, electrical work licenses, or occupancy modifications.

Organized technical documentation and regulatory compliance paperwork spread on desk with official stamps

Safety and Compliance Standards

EV charging installations must meet strict safety standards. Electrical protection systems prevent overload and short circuits. Ground fault protection guards against electrical shock. Cable specifications ensure safe current carrying capacity.

Fire safety considerations are particularly important in underground garages. Ventilation requirements may apply depending on garage configuration. Emergency disconnection systems provide quick power cutoff when needed.

Our installations include all required safety systems and exceed minimum standards where appropriate. We prioritize resident safety while maintaining regulatory compliance.

The Regulatory Approval Process

Understanding the sequence of approvals helps set realistic timeline expectations.

1

Technical Assessment & Documentation

Initial evaluation of building infrastructure and preparation of technical project report. This documentation forms the basis for all subsequent approvals.

2

Community Approval

Presentation to property owners' association and voting process. Timeline depends on meeting schedule and approval procedures established in community bylaws.

3

Municipal Permits

Application for required local permits. Processing time varies by municipality but typically ranges from two to six weeks depending on workload and complexity.

4

Distribution Company Coordination

If capacity upgrades are needed, application to distribution company for increased power supply. This step can add several weeks to months depending on required infrastructure work.